(Sorted by Title)
Category |
Number |
Title |
Rev. Date |
Division 100 | 100S02 | Amendment to MTO General Conditions of Contract, November 2016 - Ontario Provincial Standards | Mar 2018 |
Division 100 | 100F06 | Amendment to MTO General Conditions of Contract, November 2016 - Tender Items Governed By Municipal-oriented Specifications | Nov 2016 |
Division 100 | 100F08 | Protection of Public Traffic | Jun 2017 |
Division 100 | 100S15 | Amendment to MTO General Conditions of Contract, November 2016 - Utilities and Maintaining Roadways and Detours | May 2017 |
Division 100 | 100S17 | Amendment to MTO General Conditions of Contract, November 2016 | Mar 2018 |
Division 100 | 100S21 | Amendment to MTO General Conditions of Contract, November 2016 - indemnification and insurance Requirements Concerning the Canadian Pacific Railway Company | Feb 2017 |
Division 100 | 100S22 | Amendment to MTO General Conditions of Contract, November 2016 - indemnification and insurance Requirements Concerning the Canadian National Railway Company | Nov 2016 |
Division 100 | 100F28 | Amendment to MTO General Conditions of Contract, November 2016 - Property, Aircraft and Watercraft, Boiler, and Contractor’S Equipment insurance | Nov 2016 |
Division 100 | 100S59 | Amendment to MTO General Conditions of Contract, November 2016 - Approvals and Permits, and Water Taking | Nov 2016 |
Division 100 | 100S62 |
Amendment to MTO General Conditions of Contract, November 2016 - Atms Definitions, Substantial Performance, and Advance Payments for Material | Nov 2016 |
Division 100 | 101F02 | Amendment to OPSS 120, November 2014 - Identification of Waterbodies for Application of Dfo Guidelines for the use of Explosives in or Near Canadian Fisheries Waters | Dec 2014 |
Division 100 | 101S04 | Amendment to OPSS 120, November 2014 - Flyrock incident form - Part A | Jan 2017 |
Division 100 | 168F31 | Amendment to OPSS 106, April 2017 | Mar 2018 |
Division 100 | 101S11 | Additional Equipment - Equipment Option and Compensation Rates | Mar 1985 |
Division 100 | 101S12 | Power Ratings - Horse Power - Crawlers, Tractors, and Dozers | Aug 1984 |
Division 100 | 101F13 | Liquidated Damages - inadequate Supply of Equipment, Labour and Material | Aug 1984 |
Division 100 | 101S18 | Amendment to OPSS 102, October 1992 - Bar Coding on Material Delivery invoices | Apr 1994 |
Division 100 | 101F21 | Occupational Health and Safety Act Compliance - List of Designated Substances | Nov 2014 |
Division 100 | 101F23 | Amendment to OPSS 182, April 2017 - Timing of in-Water Works, oversight Requirements, and Measures to Avoid Harm to Fish | Apr 2017 |
Division 100 | 102S05 | Amendment to OPSS 206, November 2014 - Various Revisions | May 2017 |
Division 100 | 102S07 | Amendment to OPSS 220, November 2014 | Mar 2018 |
Division 100 | 103F03 | Amendment to OPSS 313, November 2016 - Requirements for Hot Mix Asphalt - End Result (Deletes and Replaces OPSS 313 in Its Entirety) | Jun 2017 |
Division 100 | 103S04 | Amendment to OPSS 366, April 2017 - Falling Weight Deflectometer | Mar 2018 |
Division 100 | 103F31 | Asphaltic Concrete Surface Smoothness - Asphaltic Concrete Payment Adjustment for Surface Smoothness Based on Quality Assurance Measurements Taken By an inertial Profiler | Jun 2017 |
Division 100 | 104S06 | Amendment to OPSS 421, November 2015 - Post installation | Dec 2017 |
Division 100 | 105S09 | Amendment to OPSS 539, November 2014 | Mar 2018 |
Division 100 | 105S22 | Amendment to OPSS 501, November 2014 - Target Density Control Strip | Jun 2016 |
Division 100 | 106S05 | Amendment to OPSS 106, April 2017 - Revisions to Definitions, Materials, and Construction for Atms Work | Jun 2017 |
Division 100 | 106S09 | Amendment to OPSS 609, November 2012 | Mar 2018 |
Division 100 | 106S10 | Amendment to OPSS 611, November 2013 | Mar 2018 |
Division 100 | 106S16 | Amendment to OPSS 617, November 2013 | Mar 2018 |
Division 100 | 106S16 | Amendment to OPSS 614, November 2012 | Mar 2018 |
Division 100 | 106S16 | Amendment to OPSS 620, April 2017 | Mar 2018 |
Division 100 | 106S16 | Amendment to OPSS 622, April 2017 | Mar 2018 |
Division 100 | 106S16 | Amendment to OPSS 631, November 2015 | Mar 2018 |
Division 100 | 107S01 | Amendment to OPSS 710, November 2010 - Short Term Pavement Marking | Sep 2011 |
Division 100 | 107S02 | Amendment to OPSS 710, November 2010 - Sample and Application Requirements | Feb 2017 |
Division 100 | 107S04 | Amendment to OPSS 740, November 2010 - Steel Reinforcement | Feb 2013 |
Division 100 | 107S05 | Amendment to OPSS 706, November 2016 - Freeway Paving Operations | Apr 2017 |
Division 100 | 109S04 | Amendment to OPSS 906, November 2012 | Mar 2018 |
Division 100 | 109S12 | Amendment to OPSS 902, November 2010 | Mar 2018 |
Division 100 | 109S13 | Amendment to OPSS 911, November 2014 - Measurement of Coating Thickness | Jul 2017 |
Division 100 | 109F16 | Transportation of Structural Components - Travel Restrictions | Feb 2009 |
Division 100 | 109S17 | Amendment to OPSS 905, November 2014 - Requirements for Steel Reinforcement for Concrete | Mar 2018 |
Division 100 | 109S18 | Amendment to OPSS 904, November 2014 | Mar 2018 |
Division 100 | 109S19 | Amendment to OPSS 908, Nov 2014 | Mar 2018 |
Division 100 | 109S22 | installation of Steel Pins | Aug 1984 |
Division 100 | 109S23 | Timber Matting | Aug 1984 |
Division 100 | 109S24 | Amendment to OPSS 909, November 2016 | Mar 2018 |
Division 100 | 109S25 | Amendment to OPSS 910, April 2008 | Mar 2018 |
Division 100 | 109S26 | Amendment to OPSS 915, Nov 2014 | Mar 2018 |
Division 100 | 109S27 | Amendment to OPSS 918, April 2017 | Mar 2018 |
Division 100 | 109S29 | Amendment to OPSS 920, November 2016 | Mar 2018 |
Division 100 | 109F30 | Amendment to OPSS 922, November 2016 | Mar 2018 |
Division 100 | 109S31 | Amendment to OPSS 422, April 2004 and OPSS 1821, May 1993 - Substitution of Precast Concrete Box Culverts for Cast-in-Place Concrete Box Culverts | Jul 2011 |
Division 100 | 109S32 | Amendment to OPSS 928, April 2012 | Mar 2018 |
Division 100 | 109F57 | Amendment to OPSS 903, Apr 2016 | Mar 2018 |
Division 100 | 109S58 | Amendment to OPSS 942, November 2009 | Mar 2018 |
Division 100 | 110S03 | Amendment to OPSS 1002, April 2013 - Fine Aggregate and Aggregate Processing, Handling, and Stockpiling | Apr 2015 |
Division 100 | 110S04 | Amendment to OPSS 1001, November 2013 - Aggregates Produced From Mine By-Product Rock | Feb 2018 |
Division 100 | 110F10 | Requirements for use of Air Cooled Iron Blast Furnace Slag As Granular Material | Sep 2001 |
Division 100 | 110F14 | information to Bidders Regarding Aggregate Sources | Jun 2012 |
Division 100 | 110S16 | Amendment to OPSS 1004, November 2012 - Quality Assurance Sampling, and Physical Property and Gradation Requirements for Granular Sheeting | May 2017 |
Division 100 | 111F06 | Amendment to OPSS 1151, November 2016 - Mix Design Criteria and Asphalt Cement anti Stripping Treatment | Mar 2017 |
Division 100 | 111F09 | Amendment to OPSS 1101, November 2014 - Additional Test Results and Samples for Performance Graded Asphalt Cement (Pgac) | Dec 2017 |
Division 100 | 111S12 | Amendment to OPSS 1103, November 2016 - Requirements for Emulsified Asphalt (Deletes and Replaces OPSS 1103 in Its Entirety) | Jul 2017 |
Division 100 | 112S07 | Amendment to OPSS 1212, November 2003 - Requirements for Hot-Poured Rubberized Asphalt Joint/Crack Sealant Compound (Deletes and Replaces OPSS 1212 in Its Entirety) | Feb 2008 |
Division 100 | 112S10 | Amendment to OPSS 1202, November 2016 - Bearings, tolerances, and Table 1 | Dec 2017 |
Division 100 | 113S03 | Amendment to OPSS 1301, September 1996 - Cementing Materials | Dec 2004 |
Division 100 | 113S09 | Amendment to OPSS 1352, November 1989 - Steel Reinforcement | Feb 2013 |
Division 100 | 114S06 | Amendment to OPSS 1440, November 2014 - Requirements for Steel Reinforcement for Concrete (Deletes and Replaces OPSS 1440 in Its Entirety) | Jun 2017 |
Division 100 | 118S03 | Amendment to OPSS 1821, May 1993 - Air Void System Parameters, Salt Scaling and Concrete Cover Measurements of Precast Hardened Concrete | Feb 2017 |
Division 100 | 124S01 | Amendment to OPSS 2471, November 2016 | Mar 2018 |
Division 100 | 124S02 | Amendment to OPSS 2414, November 2014 | Mar 2018 |
Division 100 | 168F10 | Atms Operations - interference with Atms Operations | Sep 2007 |
Division 100 | 168F14 | Requirements for Quality Control, and Documentation for Atms Work | Dec 2017 |
Division 100 | 168S20 | Protection of Existing System - Accidental Damage to Existing Atms Plant | Sep 2007 |
Division 100 | 168F31 | incentive/Disincentive for Reinstatement of Loop Detectors | Feb 2014 |
Division 100 | 168F32 | Requirements for National Transportation Communications for Its Protocol (Ntcip) for Pvms and Vms Controllers | Jul 2009 |
Division 100 | 199F03 | Placing Hot Mix Asphalt Before Seasonal Shutdown | May 2016 |
Division 100 | 199F06 | Stockpiling of Materials for Future use By the Ministry | Jul 2010 |
Division 100 | 199F12 | Environmentally Sensitive Areas | Nov 2014 |
Division 100 | 199S18 | Fencing of the Construction Area | Jun 1992 |
Division 100 | 199S24 | Supply of Trucks | Aug 1984 |
Division 100 | 199F31 | Environmental Exemptions and Permits | Apr 2016 |
Division 100 | 199F33 | Construction Noise Constraints - Noise Sensitive Areas | Jun 2013 |
Division 100 | 199S38 | Administration of Aggregate Sources including Earth Borrow and Rock Supply Sources and Highway Right-of-Way Aggregate Production - Permits and Approvals | Mar 2017 |
Division 100 | 199F43 | Other Contractors within or Adjacent to the Limits of the Contract | Mar 2018 |
Division 100 | 199S44 | Traffic Control At intersections | Jan 2001 |
Division 100 | 199S54 | Participation in the annual Laboratory Correlation Program | Feb 2018 |
Division 100 | 199S55 | Record Drawings for Structures and Foundations | May 2004 |
Division 100 | 199S56 | Requirements for Control of Emissions During Structural Work | Sep 2005 |
Division 100 | 199F57 | General Requirements of Samples for Quality Assurance, Referee and Other Testing By the Owner or the Owner's Agent | Dec 2017 |
Division 100 | 199F59 | National Energy Board (Neb) Regulated Pipelines | Dec 2017 |
Division 100 | 199S60 | incentive for Supply of Canadian Steel | Oct 2009 |
Division 100 | 199F61 | Additional Documents Available During Advertising | Dec 2016 |
Division 100 | 199F63 | Navigable Waters Protection | Mar 2012 |
Division 100 | 199S64 | General Requirements for Referee Testing | Jul 2016 |
Division 100 | 199S66 | Quality Conformance Requirements | Mar 2018 |
Division 100 | 199S65 | Contract Documents and Native format Electronic information | Dec 2016 |
Division 200 | 201F01 | Amendment to OPSS 201, November 2011 - Clearing - Salvage of Trees | May 2013 |
Division 200 | 201F02 | Amendment to OPSS 201, November 2011 - Clearing - Marketable Timber From Crown Lands | May 2013 |
Division 200 | 202S01 | Amendment to OPSS 202, November 2013 - Safety Plan for Manual Scaling Work | Feb 2018 |
Division 200 | 206F04 | Amendment to OPSS 206, November 2014 - Rock Excavation - Bulking Factor for Shale | Dec 2014 |
Division 200 | 206F06 | Amendment to OPSS 206, November 2014 - Earth Excavation | Sep 2017 |
Division 200 | 209F01 | Amendment to OPSS 209, November 2014 - Rental of Swamp Equipment | Dec 2014 |
Division 200 | 212F01 | Amendment to OPSS 212, November 2013 - Earth Borrow - Fly Ash Material | Jan 2014 |
Division 200 | 220S01 | Amendment to OPSS 220, November 2014 - Wick Drains Qve | Dec 2016 |
Division 200 | 299F01 | use of Rental Equipment | May 2002 |
Division 200 | 299F02 | Requirements for Drilling and Blasting Rock in Ditches | Apr 2014 |
Division 200 | 299F11 | Requirements for Ditch Cleanout | Sep 2009 |
Division 300 | 304F04 | Amendment to OPSS 304, November 2006 - Application of Binder, Binder Sampling, Determination of Binder and Aggregate Application Rates, Quality Assurance and Price Adjustments | Feb 2017 |
Division 300 | 305S03 | Amendment to OPSS 305, November 2016 - Granular Sealing | Mar 2017 |
Division 300 | 308F02 | Amendment to OPSS 308, April 2012 - Painting Material, Application Options, and Samples for Testing | Feb 2017 |
Division 300 | 331F02 | Amendment to OPSS 331, November 2015 - Design Rate of Expanded Asphalt | Jan 2018 |
Division 300 | 332F04 | Amendment to OPSS 332, November 2016 - Requirements for Hot in-Place Recycling with integral overlay (Deletes and Replaces OPSS 332 in Its Entirety) | Jan 2018 |
Division 300 | 333S04 | Amendment to OPSS 333, November 2015 - Compaction Measurement Using Nuclear Moisture and Density Gauge | Jan 2018 |
Division 300 | 335S04 | Amendment to OPSS 335, November 2015 - Compaction Measurement Using Nuclear Moisture and Density Gauge | Jan 2018 |
Division 300 | 336F01 | Amendment to OPSS 336, November 2009 - Micro-Surfacing | May 2016 |
Division 300 | 337F01 | Amendment to OPSS 337, November 2017 - Slurry Seal | Dec 2017 |
Division 300 | 341S01 | Amendment to OPSS 341, May 1994 - Requirements for Routing and Sealing Cracks in Asphalt Pavement (Deletes and Replaces OPSS 341 in Its Entirety) | Feb 2017 |
Division 300 | 351S01 | Amendment to OPSS 351, November 2015 - Tactile Walking Surface indicator Plates | Oct 2016 |
Division 300 | 351S02 | Amendment to OPSS 351, November 2015 - Concrete Sidewalk | Jan 2016 |
Division 300 | 353S02 | Amendment to OPSS 353, September 1996 - Concrete Curb and Gutter | Jul 2007 |
Division 300 | 399F01 | Requirements for Full Depth Crack Repairs in Asphaltic Concrete Pavements | Dec 2014 |
Division 300 | 399F02 | Requirements for Temporary Hot Mix Pavement | Jan 2017 |
Division 300 | 399S09 | Requirements for Reclaiming Existing Asphalt Pavement to A Partial Depth and Stockpiling the Processed Material for Reuse | Jun 2006 |
Division 300 | 399S10 | Requirements for Reclaiming Existing Asphalt Pavement and Asphalt Curb and Gutter to their Full Depth, and Stockpiling the Material for Reuse | May 2010 |
Division 400 | 407S01 | Amendment to Mtc form 407, March 1984 - Pipe Subdrain Outlet to Existing Structures | Feb 1988 |
Division 400 | 407S02 | Amendment to Mtc form 407, March 1984 - Rock Excavation for Sewers, Manholes, Catch Basins and Ditch inlets | Aug 2007 |
Division 400 | 407S03 | Amendment to Mtc form 407, March 1984 - Catch Basin Collar | Jul 1996 |
Division 400 | 407S06 | Amendment to Mtc form 407, March 1984 - Aggregate Requirements, Lift Rings, Adjustment Units and Resilient Connectors | Apr 2014 |
Division 400 | 415S01 | Amendment to OPSS 415, February 1990 - Tunnel - interceptor Drains and Service Connections | Mar 2012 |
Division 400 | 416S01 | Amendment to OPSS 416, February 1990 - Jacking and Boring - interceptor Drains and Service Connections | Mar 2012 |
Division 400 | 422S01 | Amendment to OPSS 422, April 2004 - Precast Concrete Box Culvert | Jul 2011 |
Division 400 | 499S02 | Requirements for Management of Highway Storm Sewer Catchbasin Cleanout Material - No Receiving Site Provided | Mar 2012 |
Division 400 | 499S03 | Weld and Release Maintenance Hole and Catch Basin Frames and Grates | Jan 2000 |
Division 500 | 517F01 | Amendment to OPSS 517, November 2016 - Design Storm Return Period and Preconstruction Survey Distance | Jul 2017 |
Division 500 | 599S22 | Requirements for Design and Construction of Rss Walls and Steep Slopes | Mar 2018 |
Division 500 | 599S23 | Requirements for Materials, Quality Assurance Testing and Acceptance Criteria for Rss Precast Concrete Elements | Mar 2018 |
Division 600 | 601S01 | Requirements for Maintenance and Operation of Temporary Traffic Signal System Work | Feb 2006 |
Division 600 | 610F01 | Amendment to OPSS 610, November 2016 - Shipping of Salvaged Electrical Equipment and Materials | Nov 2016 |
Division 600 | 611F01 | Amendment to OPSS 611, November 2013 - Luminaires | Feb 2014 |
Division 600 | 614F01 | Amendment to OPSS 614, November 2012 - Listing of Descriptions for Distribution and Supply Control Cabinet Assemblies, and Supply of Arc Flash and Shock Hazard Warning Labels | Apr 2017 |
Division 600 | 615S05 | Amendment to OPSS 615, April 2017 - Breakaway Base anti-theft Device | May 2017 |
Division 600 | 617F01 | Amendment to OPSS 617, November 2013 - Luminaires | Feb 2014 |
Division 600 | 617F03 | Amendment to OPSS 617, November 2013 - Led Luminaires | Feb 2014 |
Division 600 | 622F03 | Amendment to OPSS 622, April 2017 - Traffic Signal Controller Programming and Timing | May 2017 |
Division 600 | 623F03 | Amendment to OPSS 623, April 2017 - Listing of Product Descriptions and Verbal announcements for Accessible Pedestrian Signals | May 2017 |
Division 600 | 623F04 | Amendment to OPSS 623, April 2017 - Non-intrusive Detection System Equipment | May 2017 |
Division 600 | 630F02 | Amendment to OPSS 630, November 2016 - Sectional Steel High Mast Lighting Poles and Equipment | Mar 2018 |
Division 600 | 631S02 | Amendment to OPSS 631, November 2015 - Concrete Footings for High Mast Lighting Poles | Feb 2016 |
Division 680 | 681F15 | Requirements for Training for Atms Work | Sep 2007 |
Division 680 | 681F17 | Requirements for Spare Components for Atms Work | Sep 2007 |
Division 680 | 681F19 | Requirements for System integration Testing (Sit) for Atms Work | Dec 2017 |
Division 680 | 681F25 | Requirements for Maintenance and Warranty for Atms Work | Jun 2017 |
Division 680 | 681F32 | Requirements for Deployment of Portable Variable Message Signs (Pvms) | Sep 2007 |
Division 680 | 681F34 | Requirements for Maintenance and Warranty of Portable Variable Message Signs (Pvms) | Mar 2012 |
Division 680 | 682S01 | Requirements for Atms Field Equipment Cabinet Maintenance Sites | Apr 2016 |
Division 680 | 682S07 | Amendment to OPSS 603, November 2017 - Flexible and Rigid Ducts | Nov 2017 |
Division 680 | 682S08 | Amendment to OPSS 603, November 2017 - Surface Mounted Duct Systems | Nov 2017 |
Division 680 | 682S09 | Amendment to OPSS 604, November 2017 - Extra Low Voltage Cables | Nov 2017 |
Division 680 | 682S12 | Requirements for Power Supply Cabinets | Mar 2018 |
Division 680 | 682S13 | Amendment to OPSS 615, November 2008 - Concrete Poles | Feb 2009 |
Division 680 | 682S14 | Amendment to OPSS 616, November 2012 - Concrete Pads | Feb 2013 |
Division 680 | 682F15 | Requirements for Base Mounted Communication Pedestals | Sep 2007 |
Division 680 | 682S16 | Amendment to OPSS 622, April 2017 - Controller Cabinets | Jun 2017 |
Division 680 | 682S17 | Requirements for Advanced Traffic Controllers (Atcs) | Jul 2012 |
Division 680 | 682S18 | Requirements for Loop Vehicle Detector Sensor Units | Sep 2007 |
Division 680 | 682S19 | Amendment to OPSS 623, April 2017 - Atms Loop Detectors | May 2017 |
Division 680 | 682S20 | Requirements for Testing of Existing Loop Detectors | Sep 2007 |
Division 680 | 682F22 | Amendment to OPSS 610, November 2016 - Removal of Atms Equipment | Nov 2016 |
Division 680 | 682S23 | Requirements for inner Chambers | Sep 2007 |
Division 680 | 682S25 | Amendment to OPSS 616, November 2012 - Concrete Footings in Earth | Feb 2013 |
Division 680 | 682S26 | Requirements for Non-intrusive Traffic Sensors (Nits) (Microwave) | Dec 2017 |
Division 680 | 682S27 | Requirements for Pole Mounted Controller Cabinets | Jun 2017 |
Division 680 | 682S28 | Requirements for Uninterruptible Power Supply (Ups) Units | Nov 2013 |
Division 680 | 682S30 | Amendment to OPSS 615, November 2008 - Concrete Poles with Camera Raising and Lowering System for Closed Circuit Television (Cctv) Cameras | Jul 2009 |
Division 680 | 682F34 | Requirements for integrated External Uninterruptible Power Supply (Ups) Units | Jun 2017 |
Division 680 | 683S01 | Requirements for Fibre Optic Communication Cables in Ducts | Dec 2017 |
Division 680 | 683S02 | Requirements for Splice Enclosures for Fibre Optic Cables | Dec 2017 |
Division 680 | 683S03 | Requirements for Data interface Cables | Sep 2007 |
Division 680 | 683S04 | Requirements for Video Transmitters and Receivers | Sep 2007 |
Division 680 | 683S07 | Requirements for Video System Line Up and Test (Slat)T | Sep 2007 |
Division 680 | 683S09 | Requirements for Fibre Optic Modems (Fom) | Sep 2007 |
Division 680 | 683S10 | Requirements for Port Sharing Device (Psd) | Sep 2007 |
Division 680 | 683S11 | Requirements for Data System Line Up and Test | Sep 2007 |
Division 680 | 683F18 | Requirements for Low Range Fibre Optic Modems (Lfom), High Range Fibre Optic Modems (Hfom), Fibre Optic Taps (Fot), and Fibre Optic Splitters (Fos) | Apr 2005 |
Division 680 | 683S19 | Requirements for Field Drop and insert Nodes (Fdins), Central Drop and insert Nodes (Cdins), Data Channel Ports (Dcps), Lan Channel Ports (Lcps) and Fibre Optic Ethernet Hubs (Foehs) | Sep 2007 |
Division 680 | 683S22 | Requirements for Wireless Ethernet Bridges | Sep 2007 |
Division 680 | 683S23 | Requirements for Digital Video Encoders and Decoders | Sep 2007 |
Division 680 | 683S24 | Requirements for Port Servers | Sep 2007 |
Division 680 | 683S25 | Requirements for Ethernet Switches | Sep 2010 |
Division 680 | 683S26 | Requirements for Fibre Optic Ethernet Modems | Sep 2007 |
Division 680 | 683S27 | Requirements for Gateway Routers | Jun 2017 |
Division 680 | 683S28 | Requirements for Aerial Fibre Optic Communication Cables on Messenger Cable | Dec 2017 |
Division 680 | 684S01 | Requirements for Outdoor Closed Circuit Television Cameras (Cctv) | Sep 2007 |
Division 680 | 684S07 | Requirements for Closed Circuit Television (Cctv) Video Monitors | Sep 2007 |
Division 680 | 684S10 | Requirements for Dome Camera System | Feb 2014 |
Division 680 | 685S01 | Requirements for Variable Message Signs (Vms) | Feb 2016 |
Division 680 | 685S07 | Requirements for Fixed Support Variable Message Signs (Vms) | Feb 2016 |
Division 680 | 687S01 | Requirements for Rack Assemblies | Sep 2007 |
Division 700 | 706F04 | Amendment to OPSS 706, November 2016 - Designation of Modem and Message Details for Portable Variable Message Sign (Pvms) | Nov 2016 |
Division 700 | 708F01 | Amendment to OPSS 708, November 2016 - Portable Temporary Traffic Signals - Traffic Signal Timing | Nov 2016 |
Division 700 | 710S01 | Amendment to OPSS 710, November 2010 - Pavement Marking - Application of Stop Lines | Sep 2011 |
Division 700 | 710S02 | Amendment to OPSS 710, November 2010 - Pavement Marking - Double Application of organic Solvent Based Traffic Paint | Sep 2011 |
Division 700 | 710S03 | Amendment to OPSS 710, November 2010 - Pavement Marking Obliterating By Abrasive Blasting | Sep 2011 |
Division 700 | 710S04 | Amendment to OPSS 710, November 2010 - Pavement Marking Obliterating By Grinding | Sep 2011 |
Division 700 | 710S05 | Amendment to OPSS 710, November 2010 - Pavement Marking Obliterating By Black Line Mask | Sep 2011 |
Division 700 | 710S06 | Amendment to OPSS 710, November 2010 - Pavement Markers Recessed | Sep 2011 |
Division 700 | 710F07 | Amendment to OPSS 710, November 2010 - Short Term Pavement Marking | Sep 2011 |
Division 700 | 710F08 | Amendment to OPSS 710, November 2010 - Temporary Pavement Marking | Sep 2011 |
Division 700 | 710F09 | Amendment to OPSS 710, November 2010 - Pavement Marking, Temporary, Field Reacted Polymeric - Fluorescent orange | Feb 2012 |
Division 700 | 710F10 | Amendment to OPSS 710, November 2010 - Pavement Marking, Temporary, Paint - Fluorescent orange | Feb 2012 |
Division 700 | 710S11 | Amendment to OPSS 710, November 2010 - Pavement Marking, Temporary Removable - Fluorescent orange | Feb 2012 |
Division 700 | 721S05 | Amendment to OPSS 721, November 2015 - Single Rail Steel Beam Guide Rail - Mounting Heights | Apr 2016 |
Division 700 | 721S06 | Amendment to OPSS 721, November 2015 - Single Rail Steel Beam Guide Rail, Base Plated for Shallow Culverts | Jul 2016 |
Division 700 | 723S01 | Amendment to OPSS 723, November 2015 - Energy Attenuator | Aug 2016 |
Division 700 | 723S02 | Amendment to OPSS 723, November 2015 - Energy Attenuator - Temporary, Narrow | Feb 2017 |
Division 700 | 732S03 | Amendment to OPSS 732, April 2016 - Sbeat System | Jan 2018 |
Division 700 | 740S01 | Amendment to OPSS 740, November 2010 - Concrete and Tall Wall Barriers | Sep 2011 |
Division 700 | 741S01 | Amendment to OPSS 741, November 2014 - Temporary Concrete Barrier, Reduced Deflection | Aug 2015 |
Division 700 | 741S02 | Amendment to OPSS 741, November 2014 - Movable Temporary Concrete Barriers | Aug 2016 |
Division 700 | 760F01 | Amendment to OPSS 760, November 2014 - Noise Barrier Systems and Access | Mar 2018 |
Division 700 | 799S03 | Requirements for Temporary Transition Rail | Sep 2011 |
Division 700 | 799S04 | Requirements for Permanent React 350 | Feb 2013 |
Division 700 | 799S05 | Certification of Safety Items | Dec 2017 |
Division 700 | 799S08 | Requirements for the installation of Bollards | Sep 2011 |
Division 700 | 799S12 | Requirements for Ramp Closure Gates | May 2013 |
Division 700 | 799S15 | Requirements for High Tension Cable Guide Rail and Terminal Systems | Dec 2016 |
Division 700 | 799S17 | Requirements for Permanent intermediate Signs and Support Systems | Feb 2017 |
Division 800 | 805F01 | Amendment to OPSS 805, November 2015 - Timing Constraints for Temporary Erosion and Sediment Control Measures | Dec 2015 |
Division 800 | 899S01 | Requirements for Management and Disposal of Materials Containing Asbestos | Mar 2015 |
Division 800 | 899S02 | Requirements for Wildlife Fence | Mar 2018 |
Division 900 | 911F10 | Supplemental instructions to Bidders for Trial Blasting Methods and Amendment to OPSS 911, November 2014 - Coating Structural Steel and Steel Railing Systems | May 2016 |
Division 900 | 914F02 | Amendment to OPSS 914, November 2014 - Bridge Deck Waterproofing and Deck Surface Preparation | Dec 2014 |
Division 900 | 914S03 | Amendment to OPSS 914, November 2014 - form and Fill Grooves | Mar 2016 |
Division 900 | 922F01 | Amendment to OPSS 922, November 2016 - Elastomeric Bearings | Nov 2016 |
Division 900 | 928F01 | Concrete Removal - Partial Depth - Types A, B, C - Half Cell Survey | Aug 1995 |
Division 900 | 931S01 | Amendment to OPSS 931, May 1994 - Requirements for Structure Rehabilitation - Shotcrete (Deletes and Replaces OPSS 931 in Its Entirety) | Feb 2017 |
Division 900 | 999S02 | Requirements for Glass Fibre Reinforcing Polymer (Gfrp) Reinforcing Bar | Mar 2018 |
Division 900 | 999F29 | Requirements for the installation of Metallic Dowels into Concrete | Mar 2018 |
Division 900 | 999S30 | Requirements for Jacking of Bridge Superstructure | Mar 2018 |
Division 900 | 999S31 | Requirements for Precast Concrete Bridge Elements (Non-Prestressed and Prestressed) | Mar 2018 |
MTOSP Complete Manual | 687S01 | MTOsp Complete Manual - Revision No. 1 | Mar 2018 |
MTOSP Revision Packages | | MTOsp Revision Package No. 1 | Mar 2018 |
MTOSP Revision Sheets | | MTOsp Revision Sheet No. 1 | Mar 2018 |