NAME OF PUBLICATION: Contract Design Estimating and Documentation (CDED) Manual, Volume I and II

ATTACHMENTS: Revision 123


Please update your manual according to the following. Revised and new texts are attached for insertion as required.

SSP CODE
EXISTING
VERSION
DATE
NEW
VERSION
DATE
CPS
IMPLEMENTATION
DATE
REMARKS
100F09
100F10
100F11
100F26
April 2003
April 2004
May 26, 2004
Revised. Reference to MTO General Conditions of Contract, April 2003 changed to April 2004.
100F36
April 2004
N/A
May 26, 2004
Cancelled. Replaced by SSP 199S53.
100S51
N/A
May 2004
May 26, 2004
New. Deletes Quality Control Plan references from MTO General Conditions of Contract.
103F34
March 2003
May 2004
May 26, 2004
Revised. Warrant revised.
103F35
May 2001
May 2004
May 26, 2004
Revised. Warrant revised.
105S15
July 1997
April 2004
May 26, 2004
Revised. Reference to OPS General Conditions of Contract, August 1990 changed to MTO General Conditions of Contract, April 2004.
109F20
July 1997
May 2004
May 26, 2004
Revised. Clause 904.07.03.15.04 added.
109S39
August 1997
May 2004
May 26, 2004
Revised. Clause 904.07.03.01 added.
113S07
N/A
April 2004
May 26, 2004
New. Introduces a new submission process for concrete mix design information.
199S48
June 2003
May 2004
May 26, 2004
Revised.
- second paragraph was revised by deleting the reference to the submission of declaration forms with the Appendix to the Quality Control Plan.
- the Declaration of QVE Qualification and Certificate of Conformance forms have been removed and are now referenced as PHCC-821 and PHCC-822 respectively.
SSP CODE
EXISTING
VERSION
DATE
NEW
VERSION
DATE
CPS
IMPLEMENTATION
DATE
REMARKS
199S53
N/A
May 2004
May 26, 2004
New. Introduces MTO’s new approach to Contractor Quality Control and details the performance measures of the QC process.
199S54
N/A
May 2004
May 26, 2004
New. Taken from deleted SSP 100F36. Requires laboratories to participate in the annual Ministry Laboratory Correlation Program.
199S55
N/A
May 2004
May 26, 2004
New. Taken from deleted SSP 100F36. Outlines the requirements for the submission of Record Drawings on Structural Contracts.
399S10
May 1996
April 2004
May 26, 2004
Revised. Reference to OPS General Conditions of Contract, August 1990 changed to MTO General Conditions of Contract, April 2004.
421F01
November 2003
April 2004
May 26, 2004
Revised.
- Subsection 421.07.13 Backfilling and Compacting added.
- Table for designer to fill-in added to section 421.04.
539S01
December 2001
April 2004
May 26, 2004
Revised.
- Reference to Canadian Highway Bridge Design Code added.
- Section 539.04, changes made to requirements for submission of Certificates of Conformance and submission timelines, Information Shown on Construction Drawings / Details.
- Section 539.08 deleted. Information moved to new subsection 539.07.03 Quality Control.
599F01
September 1998
May 2004
May 26, 2004
Revised.
- General format change.
- Certificates of Conformance now required for Constructed Footings and Noise Barrier Installation.
- Clause 4.02.02 Aesthetics modified to include options for noise barrier adjacent to residential property.
- subsection 5.01 Noise Barrier added.
- reference to Ontario Highway Bridge Design Code replaced with Canadian Highway Bridge Design Code.
- subsections 7.12 Personnel and 7.13 Quality Control added.
599S20
December 2002
N/A
May 26, 2004
Cancelled. Replaced by SSP 199S53.