CDED Special Provisions: Rev. Number 123
REVISION INFORMATION SHEET
NAME OF PUBLICATION: Contract Design Estimating and Documentation (CDED) Manual, Volume I and II
ATTACHMENTS: Revision 123
Please update your manual according to the following. Revised and new texts are attached for insertion as required.
SSP CODE | EXISTING
VERSION
DATE | NEW
VERSION
DATE | CPS
IMPLEMENTATION
DATE | REMARKS |
100F09
100F10
100F11
100F26 | April 2003 | April 2004 | May 26, 2004 | Revised. Reference to MTO General Conditions of Contract, April 2003 changed to April 2004. |
100F36 | April 2004 | N/A | May 26, 2004 | Cancelled. Replaced by SSP 199S53. |
100S51 | N/A | May 2004 | May 26, 2004 | New. Deletes Quality Control Plan references from MTO General Conditions of Contract. |
103F34 | March 2003 | May 2004 | May 26, 2004 | Revised. Warrant revised. |
103F35 | May 2001 | May 2004 | May 26, 2004 | Revised. Warrant revised. |
105S15 | July 1997 | April 2004 | May 26, 2004 | Revised. Reference to OPS General Conditions of Contract, August 1990 changed to MTO General Conditions of Contract, April 2004. |
109F20 | July 1997 | May 2004 | May 26, 2004 | Revised. Clause 904.07.03.15.04 added. |
109S39 | August 1997 | May 2004 | May 26, 2004 | Revised. Clause 904.07.03.01 added. |
113S07 | N/A | April 2004 | May 26, 2004 | New. Introduces a new submission process for concrete mix design information. |
199S48 | June 2003 | May 2004 | May 26, 2004 | Revised.
- second paragraph was revised by deleting the reference to the submission of declaration forms with the Appendix to the Quality Control Plan.
- the Declaration of QVE Qualification and Certificate of Conformance forms have been removed and are now referenced as PHCC-821 and PHCC-822 respectively. |
SSP CODE | EXISTING
VERSION
DATE | NEW
VERSION
DATE | CPS
IMPLEMENTATION
DATE | REMARKS |
199S53 | N/A | May 2004 | May 26, 2004 | New. Introduces MTO’s new approach to Contractor Quality Control and details the performance measures of the QC process. |
199S54 | N/A | May 2004 | May 26, 2004 | New. Taken from deleted SSP 100F36. Requires laboratories to participate in the annual Ministry Laboratory Correlation Program. |
199S55 | N/A | May 2004 | May 26, 2004 | New. Taken from deleted SSP 100F36. Outlines the requirements for the submission of Record Drawings on Structural Contracts. |
399S10 | May 1996 | April 2004 | May 26, 2004 | Revised. Reference to OPS General Conditions of Contract, August 1990 changed to MTO General Conditions of Contract, April 2004. |
421F01 | November 2003 | April 2004 | May 26, 2004 | Revised.
- Subsection 421.07.13 Backfilling and Compacting added.
- Table for designer to fill-in added to section 421.04. |
539S01 | December 2001 | April 2004 | May 26, 2004 | Revised.
- Reference to Canadian Highway Bridge Design Code added.
- Section 539.04, changes made to requirements for submission of Certificates of Conformance and submission timelines, Information Shown on Construction Drawings / Details.
- Section 539.08 deleted. Information moved to new subsection 539.07.03 Quality Control. |
599F01 | September 1998 | May 2004 | May 26, 2004 | Revised.
- General format change.
- Certificates of Conformance now required for Constructed Footings and Noise Barrier Installation.
- Clause 4.02.02 Aesthetics modified to include options for noise barrier adjacent to residential property.
- subsection 5.01 Noise Barrier added.
- reference to Ontario Highway Bridge Design Code replaced with Canadian Highway Bridge Design Code.
- subsections 7.12 Personnel and 7.13 Quality Control added. |
599S20 | December 2002 | N/A | May 26, 2004 | Cancelled. Replaced by SSP 199S53. |
|